The Lagoon on the right side of #8 of the Nicklaus Course has been repaired. There is "touch-up" work that still needs to be completed with the sod, however we will do that when we are sodding the lagoon banks on the left side. We are currently lowering the lagoon on the left side of #8 over this weekend to reach the desired level of three feet below the top of the liner. We will take the same steps to repair this lagoon as we did for the one on the right side and expect the repair should be completed in the next two weeks, weather permitting.
No comments:
Post a Comment